%
If (Request.Form ("userId") <> "gc") then
response.redirect ("http://www.waterrail.co.uk")
end if
%>
Waterrail
Voyager Park Portsmouth
Installation of new electrically operated sectional overhead door and flashings. The door was installed ahead of the flashings so that the factory could remain secure overnight. The opening was cut into the existing composite wall cladding panels and then site specific flashings were ordered and installed. In total the works took three days to complete.