We have created Case Histories of the larger projects we have completed, showing the works and methods of installation undertaken by Waterrail Roofing Services Ltd.If you require any further information about them, please do not hesitate to contact us.
Projects Succesfully Completed by Waterrail Roofing Services Ltd
Case History 70
Gutter relining of major industrial premises in Hampshire
Waterrail Roofing Services completed our largest gutter relining contract to date in December 2008
Case History 69
CPL Aromas, Brixworth, Northamptonshire
A failing Sarnafil single ply membrane roof over the clients offices and computer room was flat to pitch converted using Speeddeck Building Systems, secret fix Speeddeck with an HPS200 Goosewing Grey finish.
A failing Sarnafil single ply membrane roof over the clients offices and computer room was flat to pitch converted using Speeddeck Building Systems, secret fix Speeddeck with an HPS200 Goosewing Grey finish.
Case History 68
Whitcombe Racing Stables, Near Dorchester, Dorset
New Build veterinary centre at Equestrian Centre
Case History 67
LST Projects Chandlers Ford
Existing failed felted flat roof over the clients offices was flat to pitch converted with a secret fix SF500 roof sheet fitted to varying height treated timber ladders.
Case History 66
Ravenscroft Breakdown and Recovery Southampton.
680 sq. metre strip and resheet of vehicle workshop and store using composite panel and temporary safety netting.
Case History 65
Wartsila Propulsion Portsmouth.
70no. rooflights replaced using Bret Martin 2.44 KG Class 1 GRP of a matching Butler E Rib profile.
Case History 64
Churches Fire Security, Mayflower House, Chandlers Ford, Hampshire.
40no. rooflights replaced using Filon Products 2.44 KG Class 1 GRP of a matching Butler E Rib
Case History 61
Whitcombe Racing Stables, Near Dorchester, Dorset.
1600 SqM of roof refurbishment.
Case History 60
OPT Foods New Greenham Common Newbury
Refurbishment of food production facility.
Case History 59
Biopharma Process Systems Winchester
Rooflight replacement of Uv degraded PVC pyramid Rooflights .
Case History 58
Ministry of Defence
Rooflight replacement of Uv degraded PVC pyramid Rooflights .
Case History 57
ACW Technology, South Wales.
Removal of redundant flues and reweathereing of previously very poorly installed roof service penetrations
Case History 56
Precision Disc Castings Poole.
Roof debris clearence and inaceessable gutter clean undertaken using a crane and man basket.
Case History 55
Precision Disc Castings Poole.
Genuine emergency repair, molten metal electricity and rain water do not mix!!
Case History 54
Precision Disc Castings Poole.
30no. failed rooflights over the electric melting area of the foundary were replaced during the companies May factory shut down.
Case History 53
Acoustic Sound Wall cladding installation inside turbine assembly hall of Major PLC
The clients brief was to reduce Internal sound reverberation and increase thermal insulation values in their machinery assembly hall.
Case History 52
Private Landlord in Ringwood Hampshire
880 Sq. metres of single skin 3” profile asbestos cement sheeting was stripped and resheeted, insulation upgrade and reroofed.
Case History 51
Graffiti removal and over painting Test Valley Borough Council Industrial Estate.
A combination of removal and over painting was undertaken to return the shutter doors and brickwork of an industrial estae which had suffered significant and persistant graffiti problems when the units were vacant.
Case History 50
Test Valley Borough Council Industrial Estate Andover.
Partly detached cappings flashings were replaced and impact damaged cladding replaced.
Case History 49
Industrial unit owned by private landlord
Existing asbestos cement roof, cladding and guttering replaced
Case History 48
Tarmac Plant Hampshire Cladding repairs
Damaged obsolete profiled asbestos cement cladding in a trafford tile profile over clad with a blue tinted heavey weight GRP cladding of a matching profile. The works were undertaken using a cherry picker.
Case History 47
Hendy Group Truck service and repair facility, Exeter, Devon
110 linear metres of failing asbestos cement gutter and 40 linear metres of downpipes replaced with Brett Martin PVCu Industrial Cascade 160mm diameter gutter and 110mm downpipes.
Case History 46
Micromill, Waterlooville,
70 Linear Metres of badly maintained and corroded internal boundary wall gutters behind a parapet were relined with H.G Sharman Ltd Rubberised plygene gutterline system.
Case History 45
Cowdrary Park, Midhurst, West Sussex
Refurbishment of farm buildings for a change of use
Case History 45
Precision Disc Castings Brake Disc mMnufacturing Foundary, Poole
Replace Impact damaged claddings and blockwork wall removed
Case History 44
Voyager Park Portsmouth
Installation of new electrically operated sectional overhead door and flashings.
Case History 43
Refurbishment of warehouse Ferndown, Dorset for Guernsey based investment company.
Replace 450sq.metres of asbestos sheeting
Case History 42
ACW Technology, Hedge End
105 Linear Metres of valley gutters relined with H.G Sharman Ltd Rubberised plygene gutterline system.
Case History 41
Gemini Data Loggers Chichester.
An In fill section of matching profiled roofing sheet was installed followed by an external plastisol coated steel gutter to by pass the existing failing internal Atcost style precast concrete gutters.
Case History 40
Peter Greens Furniture Store Chandlers Ford.
Existing profiled steel cladding removed and reclad with Corus Panels and Profiles Trimapanel micro rib composite panels in a Corus Prisma Zeus finish. New windows and staff entrance feature canopy also installed.
Case History 39
Bowman Power Southampton, Factory GRP Overroof
Removed debris and significant quantities of moss from the roof then supplied and fixed by overlaying the existing roof sheeting using Brett Martin glass fibre reinforced polyester single skin translucent sheets of a matching big six profile to approximately 130 sq. metres. Internal safety netting was provided along with debris netted double handrailed scaffolding.
Case History 38
Molekula, Refurbishment of warehouse Verwood Dorset
Double skin asbestos cement sheeting replaced using 800sq. metres of 80mm thick Corus Panels and Profiles HPS200 Merlin Grey Trisomet composite panels and Brett Martin FAIRS rooflights. The asbestos cement valley gutter was relined using a Plygene gutter liner. The companies operations were largely maintained throughout the construction phase of the project by using a combined debris and safety net and by shrink rapping the products on the raking.
Case History 37
New Build Helicopter Hangar Hampshire.
220 sq.
metres of Corus Panels and Profiles Olive
Green Trisomet composite panels
incorporating Bret Martin factory assembled
rooflights and new eaves hung plastisol
coated steel gutters. 240 sq. metres of
Corus Panels and Profiles Trimapanel 1000
mico rib Olive Green 70mm thick composite
wall panel supplied and installed on a new
build Hangar. Site assembled double skinned
cladding was also installed on the doors to
achieve an internal and external finish.
Case History 36
Woking Gymnastics club Surrey
Roof
refurbishment of Woking Gymnastics club.
Single skin profiled steel sheeting and over
purlin celotex board lining panel replaced
using 820 sq. metres of 80mm thick Corus
Panels and Profiles Merlin Grey Trisomet
composite panels incorporating Bret Martin
factory assembled rooflights. New timber
purlins were hammer fixed to the existing
concrete purlins with fisher fixings. 80
linear metres of existing internal concrete
gutters were bypassed with new eaves hung
plastisol coated steel units by extending
the length of the roof sheeting. New air
handling fans and permanent venting cowls
were installed to provide fresh air flow
within the gymnasium.
Case History 35
Warsash Marine, Warsash Southampton.
Refurbishment of boat repair and servicing
workshop, single skin asbestos cement
claddind sheeting was replaced using 520 sq.
metres of 40mm thick Corus Panels and
Profiles Merlin Grey Trisomet composite
cladding panels including the provision of a
new roller shutter door.
Case History 34
Peckham London
A new
build 9 storey block of flats required
capping flashings to weather the junction of
the new Sarnafil single ply membrane roof
covering and the rendered external wall
finish and to cap off an old concrete coping
stone on the front elevation.
180no. failed PVC rooflights replaced with Brett Martin Daylight Systems (factory assembled GRP rooflights) trilite fair 24 with a superlife finish, 2.4kg/sqm weight in fire grade SAB3/SAA1. Internal safety and debris netting was deployed throughout the contract along with external roof edge protection achieved using Safehires Anchorguard Guardrails with debris netting mechanically fixed at 3.0m centres to the existing roof sheeting. New saddle washers, lap locks along with side and end lap sealer tape installed with colour headed main side lap stitcher and mega stitcher fixings .
Case History 32
Refurbishment of warehouse facility
Horndean Hampshire.
Single
skin asbestos cement sheeting with a
plasterboard liner replaced using 500 sq.
metres of 80mm thick Corus Panels and
Profiles HPS200 Merlin Grey Trisomet
composite panels and Brett Martin Trilite
Fair roof lights 60 linear metres of
boundary gutter relined with H.G Sharman Ltd
Rubberised plygene gutterline system.
Case History 31
Major refurbish of Industrial manufacturing facility Chessington Surrey
Refurbishment of main factory. Single skin big 6 asbestos cement sheeting and under purlin fibreboard lining panel replaced using 1120 sq. metres of 80mm thick Corus Panels and Profiles HPS200 Merlin Grey Trisomet composite panels. 90 linear metres of asbestos cement gutters were replaced with new galvanised steel units.
Case History 30
Refurbishment of industrial facility
130 sq. metres of single skin asbestos cement sheeting replaced using Merlin Grey plastisol coated roofing sheet including 100mm insulation quilt and 40 linear metres of valley gutter relined with H.G Sharman Ltd Rubberised plygene gutterline system.
Case History 29
Swanfield Church Chichester
Lifting and split copper seams on a church roof in Chichester over laid with butile tape backed Moorland Green coloured strips.
Case History 28
Property in Christchurch.
90 Linear Metres of corroded boundary wall gutters relined with H.G Sharman Ltd Rubberised plygene gutterline system.
Case History 27
Swanmore Lawn Tennis Club clubhouse, Swanmore, Hampshire.
Existing clubhouse over roofed with 100 sq. metres of 0.7mm Moorland Green roofing sheets and 100mm thick insulation quilt.
Case History 26
Multi national companies operation in Hampshire.
The project involved a 2800 Sq. metres over sheet of an existing built up metal roof using Euroclad SF500 secret fix profile in Corus HPS200 Goosewing Grey, incorporating a 100mm thick insulation quilt with a Eurobar spacer system.
Case History 25
Commercial property,Hampshire
Redundant plant room over roofed using Quedron 0.75mm Q Deck 160/ 750 decking profile spanning 5.0metres. Varying height galvanised steel zeds where used to create a fall. The materials were craned into place and flashed and sealed to the existing cladding.
Case History 24
Dairycrest Unigate Basingstoke
Roof sheeting and cladding on an Impact damaged milk float canopy replaced with heavy weight Brett Martin 3.06 kg sq.metre GRP Goosewing Grey Coloured matching profile sheets. A temporary internal working platform along with full edge protection scaffold was installed during the construction phase.
Case History 23
Wesmid Lewisham
Retail Unit, Lewisham London. Refurbishment of 2no. shop adjoining retail units, single skin asbestos cement sheeting was replaced using 120 sq. metres of 80mm thick Corus Panels and Profiles HPS200 Merlin Grey Trisomet composite panels and 50 sq. metres of white single skin cladding. 20 linear metres of gutters were relined using an H D Sharman plygene gutter liner.
Case History 22
ex MFI site
300 linear metres of rooflights, 4no. smoke vents and 14no. redundant services removed and resheeted with Quedron 1000/32R Corus HPS200 coated roofing sheets including the installation of 100mm thick Rockwool insulation quilt. 12000no. fixings changed to new colour headed fixings, 800 linear metres of edge peel/delamination repainted and 200 linear metres of gutters jet washed and coated with Aquapol Plus high fibre mastic solution.
Case History 21
William Sawyer Garage
Existing single skin cladding removed and replaced on car showroom elevations and forecourt canopy using Corus HPS200 White cladding and flashings.
Case History 20
St Swithuns
St Swithun’s School Winchester. 110 sq. metres of failed translucent sheeting over the science laboratories was replaced with Plastmo Profiles Everlite Enduro uv polycarbonate planks. The new product is reinforced with an aluminium bar to increase its strength and spanning capability.
Case History 19
Hendy Ford Shirley Southampton.
100 sq. metres of fascia panel to the new car show room and 200 sq. metres of cladding on a forecourt canopy replaced in line with Ford Motor Company re-branding programme.
Case History 18
Industrial Unit, Horndean.
Refurbishment of Class 1 warehouse. Single skin asbestos cement sheeting with plasterboard liner was replaced using 480 sq.metres of 80mm thick Corus Panels and Profiles HPS200 Merlin Grey Trisomet composite panels and 50 sq.metres of factory assembled rooflights. 60 linear metres of gutters were relined using H D Sharman plygene gutter liners.
Case History 17
Coolers and Condensers Ltd, Fareham.
110 Linear Metres of badly corroded boundary wall gutter relined with H.G Sharman Ltd Rubberised plygene gutterline system.
Case History 16
Gen Plus and Solent Mould Tools Waterlooville.
600 linear metres of failed cappings, cills and window trims over clad with Corus HPS200 Petra coloured flashings.
Case History 15
Worthy sand and Ballast Winchester.
Flat to pitch conversion of existing failed felt roof using Euroclad secret fix SF500 HPS200 Goosewing Grey roof sheeting and HPS200 Merlin Grey capping flashings. Varying height treated timber battens where fixed into the existing timber joists to create a fall.
Case History 14
Rafferty Newman Fareham Ltd.
300 Sq. metres over roof and 100 sq. metre over clad of Triumph Motor Bike Showroom including the installation of Rockwool insulation. Corus Sargasso Blue HPS200 cladding used.
Case History 13
Winchester Garden Machinery
Over roof and reclad of machinery workshop and store
Case History 12
Wyndenham Impact Printers Basingstoke.
170 linear metres of failed PVC rooflights replaced with 2.44 KG GRP rooflights. The existing internal skin was also cleaned. The works were carried out to minimise any impact on the printing operations at the works.
Case History 11
Alpha Laboratories Eastleigh.
380 sq. metre over roof using a stucco embossed aluminium sheeting and 80mm Rockwool insulation quilt to match the first phase. A temporary internal safety net was installed during the construction phase.
Case History 10
Atlantic Refrigeration Southampton
480 Sq. metres over roof and 100 sq. metre over clad of industrial premises including the installation of Rockwool insulation. A temporary internal safety net was installed during the construction phase.
Case History 9
Burseldon Motors Durley Southampton.
Overroof and overclad in metallic silver
Case History 8
Hampshire Toy Centre
Re-roof and over clad of showroom and storage area
Case History 7
Genplus Ltd, Hampshire
Replacement of failed PVC dome rooflights
Case History 6
Fuel Mechanics Ltd, Hampshire
Replacement of faded and damaged cladding
Case History 5
Polycast, Warsash
Asbestos removal and cladding replacement
Case History 4
Industrial Unit, Worthing
Removal and reroof.
Case History 3
Go Bowling 10 Pin Bowling Centre, Fareham
Guttering repairs
Case History 2
ex Office World site, Southampton for CGNU Life Assurance Ltd
End of lease delapidation
Case History 1
Dowding & Mills Engineering, Southampton
Rooflight replacement whilst keeping the facility operational