Working direct for the estates lease holder missing and partly detached cappings flashings were replaced with 110 linear metres of plastisol coated steel Vandyke Brown cappings. Impact damaged cladding and drip flashings replaced with hand made matching profile sheets formed on a break press, the entire area will now be overpainted. |