Home Services Projects Solutions Case Histories About us Brochure Contact us
Solutions by Waterrail
Here is a selection of projects completed by Waterrail Roofing Services Ltd. If you would like to discuss a project or service we provide, need a quote or require more details please contact us here. Contact Us Now on 07795 972 663 or click here!
More projects.....
 
PROJECT ONE HUNDRED
Roof debris clearance Roof debris clearance Roof debris clearance
Precision Disc Castings Poole.
Roof debris clearance
  Case Study
 
PROJECT NINETY NINE
emergency repair emergency repair emergency repair
Genuine emergency repair, molten metal electricity and rain water do not mix!!
Failed rooflight directly over the electric melting area of the foundary
  Case Study
 
PROJECT NINETY EIGHT
Rooflight Replacement Rooflight Replacement Rooflight Replacement
Rooflight replacement Precision Disc Castings Poole.
30no. failed rooflights over the electric melting area of the foundary.
  Case Study
 
PROJECT NINETY SEVEN
Acoustic Sound Wall cladding installation Acoustic Sound Wall cladding installation Acoustic Sound Wall cladding installation
Acoustic Sound Wall cladding installation inside turbine assembly hall of Major PLC
The clients brief was to reduce Internal sound reverberation and increase thermal insulation values in their machinery assembly hall.
  Case Study
 
PROJECT NINETY SIX
Insulation upgrade Insulation upgrade Insulation upgrade
Private Landlord in Ringwood Hampshire.
Insulation upgrade and reroof of 880 sq. metres of a series of small business units.
  Case Study
 
PROJECT NINETY FIVE
Roof repair. Roof repair. Roof repair.
Precision Disc Castings Poole, Core Shop, Roof repair.
An existing triple skin asbestos cement sheeted roof had slipped due to failing rusted hook bolts. We stripped and resheeted the roof using Supa safe mesh reinforced GRP translucent sheeting fixed directed to the existing hot rolled steel purlins. Temporary internal netting and external scaffold was also provided.
  Case Study
 
PROJECT NINETY FOUR
Graffiti removal Graffiti removal Graffiti removal
Graffiti removal and over painting Test Valley Borough Council Industrial Estate.
A combination of removal and over painting was undertaken to return the shutter doors and brickwork of an industrial estae which had suffered significant and persistant graffiti problems when the units were vacant.
  Case Study
 
PROJECT NINETY THREE
Refurbishment of warehouse Refurbishment of warehouse Refurbishment of warehouse
Refurbishment of warehouse Ferndown, Dorset for Guernsey based investment company.
Replace 450sq.metres of asbestos sheeting
  Case Study
 
PROJECT NINETY TWO
Partly detached cappings flashings Partly detached cappings flashings Partly detached cappings flashings
Test Valley Borough Council Industrial Estate Andover.
Partly detached cappings flashings were replaced and impact damaged cladding replaced.
  Case Study
 
PROJECT NINETY ONE
Existing asbestos cement roof, cladding and guttering replaced Existing asbestos cement roof, cladding and guttering replaced Existing asbestos cement roof, cladding and guttering replaced
Industrial unit owned by private landlord
Existing asbestos cement roof, cladding and guttering replaced
  Case Study
 
PROJECT NINETY
Gutter relining Gutter relining Gutter relining
Tarmac Plant Hampshire Cladding repairs
Damaged obsolete profiled asbestos cement cladding in a trafford tile profile over clad with a blue tinted heavey weight GRP cladding of a matching profile. The works were undertaken using a cherry picker.
  Case Study
 
 
PROJECT EIGHTY NINE
Gutter relining Gutter relining Gutter relining
Gutter and fascia replacement Hendy Group Truck service and repair facility, Exeter, Devon.
110 linear metres Replaced with Brett Martin PVCu Industrial Cascade fixed through a new plastisol flashing into a new treated timber fascia which was fixed with hot rolled fixing directly into the main steel frame.
  Case Study
 
PROJECT EIGHTY EIGHT
Gutter relining Gutter relining Gutter relining
Chemical re-processing plant, Southampton.
60 Linear Metres of failed eaves gutter relined with H.G Sharman Ltd Rubberised plygene gutterline system.
  Case Study
 
PROJECT EIGHTY SEVEN
Rooflight Replacement Rooflight Replacement
Rooflight Replacement
180 no. failed PVC rooflights replaced with Brett Martin Daylight Systems (factory assembled GRP rooflights) trilite fair 24 with a superlife finish, 2.4kg/sqm weight in fire grade SAB3/SAA1
  Case Study
 
PROJECT EIGHTY SIX
Amec Industrial Division. Milford Energy Ltd, Red Dragon Power Station, Milford Haven, Pembrokeshire, Wales.
Phase 1 of contract February 2008.
The sites project management found Waterrail Roofing Services via our web site. We were called to site to advise on a possible solution to a totally failed gutter in the turbine hall of the power station. 52 Linear Metres of boundary gutter relined with H.G Sharman Ltd Rubberised plygene gutterline system. A galvanised steel flashing break pressed to match the existing profile was fixed in the sole of the gutter to prevent ponding and puncture by the existing totally failed gutter. 4no. outlets and 2no. stop ends and 2no. weir overflows were heat welded to the liner to create a joint and detail free gutter. Because the sole of the gutter was 500mm wide and the sites high exposure location holding down straps were also fixed at 2.0m centre to prevent wind uplifting the liner. Badly rusted roof sheeting which had been located beneath steam pipes were also overlaid with a matching profile and the total roof area was brush and petrol blower cleaned to remove an accumulation of debris.
Due to sight regulations, no images are available for this project.
 
 
PROJECT EIGHTY FIVE
Amec Industrial Division. Milford Energy Ltd, Red Dragon Power Station, Milford Haven, Pembrokeshire, Wales.
Phase 2 of contract March 2008.
The sites project management found Waterrail Roofing Services via our web site. Having relined a failed boundary wall gutter using a Plygene gutter liner a second order was placed to supply and install an acoustic liner panel and insulation system because the existing insulation had suffered significant water damage and staining. 360 sq. metres of 100mm thick Rockwool high density RWA45 insulation slabs were secured to the existing liner panel using self adhesive insulation pins. Then fully perforated 0.7mm thick bright white coloured steel liner panels were fitted to the internal face of the existing sheeting rails all ductwork, louvers, control panels and heat sensors were then trimmed with flashings.
Due to sight regulations, no images are available for this project.
 
 
PROJECT EIGHTY FOUR
Voyager Park Portsmouth Voyager Park Portsmouth
Re Roof of the Game keepers Lodge
The existing failing profiled steel roof sheeting of the game keepers lodge and store was re-clad with 100 sq. metres of 0.7mm Olive Green 1000/32 Quedron roofing sheets, including new barge, ridge flashings, timber cladding windows and external gutter.
  Case Study
 
 
PROJECT EIGHTY THREE
Voyager Park Portsmouth
Micromill, Waterlooville, Part of the Cobham Group
70 Linear Metres of badly maintained and corroded internal boundary wall gutters behind a parapet were relined with H.G Sharman Ltd Rubberised plygene gutterline system.
  Case Study
 
PROJECT EIGHTY TWO
Voyager Park Portsmouth
Cowdray Park, Midhurst, West Sussex
Refurbishment of farm buildings for a change of use to a Forestry Workshop, equipment and timber store.
  Case Study
 
PROJECT EIGHTY ONE
Voyager Park Portsmouth Voyager Park Portsmouth
Warehouse roof and rooflight refurbishment Hook Hampshire
50no. rooflights replaced in warehouse using Filon 2.44 KG Class 1 GRP in a Cape Monad profile.
  Case Study
 
PROJECT EIGHTY
Voyager Park Portsmouth Voyager Park Portsmouth
Hendy Group Ford dealerships workshop Cosham Hampshire.
Storm damaged and cracked roofing sheets overlaid with heavy weight matching profiled GRP translucent panels.
  Case Study
 
PROJECT SEVENTY NINE
Voyager Park Portsmouth Voyager Park Portsmouth
Precision Disc Castings Brake Disc mMnufacturing Foundary, Poole
Replace Impact damaged claddings and blockwork wall removed
  Case Study
 
PROJECT SEVENTY EIGHT
Basingstoke College of Technology.
Condensation control measure new project.
  Case Study
 
 
PROJECT SEVENTY SEVEN
Voyager Park Portsmouth Voyager Park Portsmouth
Voyager Park Portsmouth
Installation of new electrically operated sectional overhead door and flashings.
  Case Study
 
PROJECT SEVENTY SIX
Labcraft Ltd Chelmsford Labcraft Ltd Chelmsford Labcraft Ltd Chelmsford
    Case Study

Labcraft Ltd Chelmsford

90no. rooflights replaced in the warehouse
 
PROJECT SEVENTY FIVE
ACW Technology, Hedge End ACW Technology, Hedge End ACW Technology, Hedge End
    Case Study

ACW Technology, Hedge End

105 Linear Metres of valley gutters relined with H.G Sharman Ltd Rubberised plygene gutterline system.
 
PROJECT SEVENTY FOUR
Royal Air Force Odiham, Metrological office, Odiham, Hampshire.
Waterrail Roofing Services was chosen by the term contractor to undertake the replacement of rotten timber cladding to the elevations of the metrological office at RAF Odiham Air Station. The works were carried out in a pre planned and phased way to prevent any impact on the buildings operations or personnel. Secret fix low profile Metallic Silver cladding was fixed alongside rigid insulation panels and flashings. New windows and doors were also installed and weathered. (Sorry no photography was allowed on the site).
 
PROJECT SEVENTY THREE
    Case Study

Gemini Data Loggers Chichester.

 
PROJECT SEVENTY TWO

Warmafloor Fareham Hampshire.

3no. varying size sun pipes were installed and weathered into existing composite panel roofing sheets as part of a showroom featuring the companies product range.
 
PROJECT SEVENTY ONE
    Case Study

Geo Kingsbury Machine Tools, Gosport.

 
 
PROJECT SEVENTY
    Case Study

Hendy Group Bodyshop Fareham.

More projects.....
 
 
PROJECT SIXTY NINE
    Case Study

Chitty Group Guildford

 
PROJECT SIXTY EIGHT
 
    Case Study

Bowman Power Southampton, Factory GRP Overroof

 
 
PROJECT SIXTY SEVEN
 
    Case Study

Molekula, Refurbishment of warehouse Verwood Dorset

 
 
PROJECT SIXTY SIX
 
    Case Study

Peter Greens Furniture Store Chandlers Ford.

 
PROJECT SIXTY FIVE
 
    Case Study

New Build Helicopter Hangar Hampshire.

 
 
PROJECT SIXTY FOUR
 
    Case Study

Woking Gymnastics club Surrey

 
 
PROJECT SIXTY THREE
    Case Study

Warsah Marine, Warsash, Hampshire

 
 
PROJECT SIXTY TWO
    Case Study

Peckham London

 
 
PROJECT SIXTY ONE
Fleetlands Helicopter Refurbishment Facility, Gosport.
180no. failed PVC rooflights replaced with Brett Martin Daylight Systems (factory assembled GRP rooflights) trilite fair 24 with a superlife finish, 2.4kg/sqm weight in fire grade SAB3/SAA1. Internal safety and debris netting was deployed throughout the contract along with external roof edge protection achieved using Safehires Anchorguard Guardrails with debris netting mechanically fixed at 3.0m centres to the existing roof sheeting. New saddle washers, lap locks along with side and end lap sealer tape installed with colour headed main side lap stitcher and mega stitcher fixings .
Case Study
 
 
PROJECT SIXTY
    Case Study

Refurbishment of warehouse facility Horndean Hampshire.

Single skin asbestos cement sheeting with a plasterboard liner replaced using 500 sq. metres of 80mm thick Corus Panels and Profiles HPS200 Merlin Grey Trisomet composite panels and Brett Martin Trilite Fair roof lights 60 linear metres of boundary gutter relined with H.G Sharman Ltd Rubberised plygene gutterline system.
 
 
PROJECT FIFTY NINE
    Case Study

Major refurbish of Industrial manufacturing facility Chessington Surrey

Refurbishment of main factory.
 
PROJECT FIFTY EIGHT
    Case Study

Swanfield Church Chichester

Lifting and split copper seams on a church roof in Chichester over laid with butile tape backed Moorland Green coloured strips.
 
 
PROJECT FIFTY SEVEN
    Case Study

Refurbishment of industrial facility

130 sq. metres of single skin asbestos cement sheeting replaced using Merlin Grey plastisol coated roofing sheet including 100mm insulation quilt and 40 linear metres of valley gutter relined with H.G Sharman Ltd Rubberised plygene gutterline system.
 
PROJECT FIFTY SIX
    Case Study

Property in Christchurch.

90 Linear Metres of corroded boundary wall gutters relined with H.G Sharman Ltd Rubberised plygene gutterline system.
 
PROJECT FIFTY FIVE
    Case Study

Swanmore Lawn Tennis Club clubhouse, Swanmore, Hampshire.

Existing clubhouse over roofed with 100 sq. metres of 0.7mm Moorland Green roofing sheets and 100mm thick insulation quilt.
 
 
PROJECT FIFTY FOUR
    Case Study

2800 Sq. metres oversheet of Commercial Premises in Hampshire

2800 Sq. metres over sheet of an existing built up metal roof using Euroclad SF500 secret fix profile in Corus HPS200 Goosewing Grey, incorporating a 100mm thick insulation quilt with a Eurobar spacer system. 300 linear metres of gutters were jet washed and coated with Aquapol Plus solution. Flag UK Ltd Flagon SFc light grey single ply membrane was used to weather 4no. large ventilation ducts to the new roof covering. Stainless steel wire mesh was attached to the existing glazed atrium to act as fall protection both during the construction phase of the project and also for any future gutter cleaning operations. Hip, valley, ridge, side abutment and service penetration details were all carried out in accordance with Euroclads technical specification.
 
 
PROJECT FIFTY THREE
    Case Study

Commercial Property in Hampshire

Redundant plant room over roofed using Quedron 0.75mm Q Deck 160/ 750 decking profile spanning 5.0metres. Varying height galvanised steel zeds where used to create a fall. The materials were craned into place and flashed and sealed to the existing cladding.
 
PROJECT FIFTY TWO

Eastleigh Borough Council

Leaking gutters and failed expansion joint over the offices of the transport depo Hedge End, repaired with Aquapol plus solution and an aluminium cover flashing.
 
 
 
PROJECT FIFTY ONE
 
    Case Study

Ex MFI site, Southampton for CGNU Life Assurance Ltd End of lease dilapidation

300 linear metres of rooflights, 4no. smoke vents and 14no. redundant services removed and resheeted with Quedron 1000/32R Corus HPS200 coated roofing sheets including the installation of 100mm thick Rockwool insulation quilt. 12000no. fixings changed to new colour headed fixings, 800 linear metres of edge peel/delamination repainted and 200 linear metres of gutters jet washed and coated with Aquapol Plus high fibre mastic solution.
 
 
PROJECT FIFTY

McLaren Automotive. 

A Whitesales twin wall polycarbonate lockable Access hatch fitted to a welded aluminium kerb and backplates was cut, installed and weathered into a composite panel roof to enable safe access to service air conditioning units on the roof of the McLaren Mercedes SLR body shell and subframe assembly plant.
 
PROJECT FORTY NINE

Burseldon Motors Durley Southampton.  

120 Sq. metres of 0.7mm white cladding sheets and 100mm thick insulation quilt installed internally to over clad the workshop of Burseldon Motors, Mercedes Benz service and repair specialists.
 
PROJECT FORTY EIGHT
   
St Swithun’s School Winchester
110 sq. metres of failed translucent sheeting over the science laboratories was replaced with Plastmo Profiles Everlite Enduro uv polycarbonate planks. The new product is reinforced with an aluminium bar to increase its strength and spanning capability.
 
PROJECT FORTY SEVEN
    Case Study
Dairycrest Unigate Basingstoke
Roof sheeting and cladding on an Impact damaged milk float canopy replaced with heavy weight Brett Martin 3.06 kg sq.metre GRP Goosewing Grey Coloured matching profile sheets. A temporary internal working platform along with full edge protection scaffold was installed during the construction phase.
 
 
PROJECT FORTY SIX
Case Study
Retail Unit, Lewisham London.

Refurbishment of 2no. shop adjoining retail units, single skin asbestos cement sheeting was replaced using 120 sq. metres of 80mm thick Corus Panels and Profiles HPS200 Merlin Grey Trisomet composite panels and 50 sq. metres of white single skin cladding. 20 linear metres of gutters were relined using an H D Sharman plygene gutter liner.

 
PROJECT FORTY FIVE
    Case Study
Industrial Unit, Horndean.

Refurbishment of Class 1 warehouse. Single skin asbestos cement sheeting with plasterboard liner was replaced using 480 sq.metres of 80mm thick Corus Panels and Profiles HPS200 Merlin Grey Trisomet composite panels and 50 sq.metres of factory assembled rooflights. 60 linear metres of gutters were relined using H D Sharman plygene gutter liners.

 
PROJECT FORTY FOUR
   
Westfield Systems Fareham

380 Sq. metres of big 6 asbestos cement roof and 100 sq. metre over cladding over sheeting with Merlin Grey plastisol coated steel at a commercial premises including the installation of Rockwool insulation.

 
PROJECT FORTY THREE
Precision Disc Castings Poole.

100 sq. metres of failed wired glass vertical glazing replaced with heavy weight 3.06 kg sq.metre GRP rooflights. A temporary internal safety net was installed during the construction phase. The works were carried out during a factory shutdown to minimise any impact on the operations at the plant.

 
PROJECT FORTY TWO
Crewsaver Gosport.

110 linear metres of failing asbestos cement gutter and 80 linear metres of downpipes replaced with Brett Martin upvc Cascade 160mm diameter gutter and 110mm downpipes fixed through a new plastisol flashing into a new treated timber fascia.

 
 
 
PROJECT FORTY ONE
    Case Study
Gen Plus and Solent Mould Tools Waterlooville.

600 linear metres of failed cappings, cills and window trims over clad with Corus HPS200 Petra coloured flashings.

 
 
 
PROJECT FORTY
    Case Study

Worthy sand and Ballast Winchester.

Flat to pitch conversion of existing failed felt roof using Euroclad secret fix SF500 HPS200 Goosewing Grey roof sheeting and HPS200 Merlin Grey capping flashings. Varying height treated timber battens where fixed into the existing timber joists to create a fall.

 
 
PROJECT THIRTY NINE
    Case Study

Rafferty Newman Fareham Ltd.

300 Sq. metres over roof and 100 sq. metre over clad of Triumph Motor Bike Showroom including the installation of Rockwool insulation. Corus Sargasso Blue HPS200 cladding used.

 
 
PROJECT THIRTY EIGHT
    Case Study
HENDY FORD, SHIRLEY, SOUTHAMPTON
100 sq. metres of fascia panel to the new car show room and 200 sq. metres of cladding on a forecourt canopy replaced in line with Ford Motor Company re-branding programme.
 
 
PROJECT THIRTY SEVEN
   
WYNDENHAM IMPACT PRINTERS, BASINGSTOKE
170 linear metres of failed PVC rooflights replaced with 2.44 KG GRP rooflights. The existing internal skin was also cleaned. The works were carried out to minimise any impact on the printing operations at the works.
 
 
PROJECT THIRTY SIX
   
ALPHA LABORATORIES, EASTLEIGH
380 sq. metre over roof using a stucco embossed aluminium sheeting and Rockwool insulation quilt to match the first phase. A temporary internal safety net was installed during the construction phase.
 
 
PROJECT THIRTY FIVE
   
ATLANTIC REFRIGERATION, SOUTHAMPTON
480 Sq. metres over roof and 100 sq. metre over clad of industrial premises including the installation of Rockwool insulation. A temporary internal safety net was installed during the construction phase.
 
 
PROJECT THIRTY FOUR
   
BURSLEDON MOTORS, DURLEY, SOUTHAMPTON
380 Sq. metres overroof and 150 sq. metre overclad of Mercedes Benz service and repair specialists. Metallic Silver secret fixed 280 cladding from Speeddeck Building Systems was used on the wall cladding to create a dramatic visual effect. A temporary internal safety net was installed during the construction phase.
 
 
PROJECT THIRTY THREE
Case Study
   
MYRTLE GROVE ESTATES ,WORTHING
300 sqm existing single skin asbestos roof replaced with composite panels and factory rooflights
 
 
PROJECT THIRTY TWO
   
GO BOWLING, 10 Pin Bowling Centre, FAREHAM
150 linear metres of gutters relined with H.G Sharman Ltd rubberised plygene gutterline system.
 
 
PROJECT THIRTY ONE
   
DOWDING AND MILLS ENGINEERING, SOUTHAMPTON
200 sqm of rooflights replaced with 2.4 Kg per Sqm Bret Martin Class 3 GRP inline rooflights.
 
 
PROJECT THIRTY
PRECISION DISC CASTINGS (Repeat business customers, 5 orders to date)
Various roof repairs carried out along with gutter clean and debris removal from a large in places totally inaccessible roof on this large industrial plant. 65 metre reach achieved using crane with fly jib.
 
 
PROJECT TWENTY NINE
   
Case Study
EX OFFICE WORLD SITE, SOUTHAMPTON
Various works undertaken including 500 linear metres of end of lease delamination treatment
 
Recladding of car showroom elevations and forecourt canopy.
 
 
PROJECT TWENTY EIGHT
   
Waterlooville Company
Failed asbestos cement sheeting replaced with new fibre cement profile 2000
 
PROJECT TWENTY SEVEN
     
    Case Study
Coolers and Condensers Ltd , Fareham.
110 Linear Metres of badly corroded boundary wall gutter relined with H.G Sharman Ltd Rubberised plygene gutterline system.
 
 
PROJECT TWENTY SIX
 
Hendy Ford Shirley, Southampton.
Damaged cladding replaced under insurance claim.
 
PROJECT TWENTY FIVE
Ex Exon European Headquarters, Fareham
250 Linear Metres of guttering jet washed and coated with Aquapol Plus Coating Solution
 
PROJECT TWENTY FOUR
JG Autos
Overclad of existing asbestos cladding with new Merlin Grey Plastisol Coated Steel sheeting and flashings.
 
PROJECT TWENTY THREE
SOLENT MOULD TOOLS, WATERLOOVILLE
100 sq. metres of failed PVC barrel vaulted rooflights replaced with 12 linear metre long Filon Supasafe GRP in line profiled roof lights which were craned in place using a lifting beam.

 
PROJECT TWENTY TWO
Case Study
WARSASH
Asbestos cement roof sheeting and cladding replaced with 500 square metres of Euroclads site assembled, insulated merlin grey system.
 
PROJECT TWENTY ONE
WATERLOOVILLE
150 linear metres of gutters cleaned, pressure washed and coated with Aquapol Plus .
 
PROJECT TWENTY
WIMBOURNE
Helibar crack stitchers installed where existing brickwork had been damaged by vehicle impact.
 
 
PROJECT NINTEEN
SPARSHOLT CRICKET CLUB, NR. WINCHESTER
All weather wicket power washed to remove moss and algae.

 
 
PROJECT EIGHTEEN
SPARSHOLT CRICKET CLUB, NR. WINCHESTER
GRP sheeting on the wicket covers power washed and new drainage pipes fitted.

 
 
PROJECT SEVENTEEN
FUEL MECHANICS LTD, CHANDLERS FORD.
Badly installed and leaking boiler and soil vent pipe flues repaired and sealed with new heat rated pipe flashings and plastisol coated steel backplates.
 
PROJECT SIXTEEN
HENDY GROUP, CHELTENHAM
Installation of 3no. polycarbonate domes & GRP workshop rooflights.

 
PROJECT FIFTEEN
Satellite Pet Foods Southampton.
Gutter cleaned and coated with Acrypol Plus high fibre cold brush applied mastic paste.
 
PROJECT FOURTEEN
GOSPORT
Helibar crack stitchers installed where existing brickwork had suffered from settlement cracks.

 
PROJECT THIRTEEN
NEWBURY
Rusted and leaking gutters refurbished by relining with 170 linear metres of H.G Sharman Ltd Rubberised plygene gutterline system.

 
PROJECT TWELVE
DREWETT NEATE PROPERTY SURVEYORS , ANDOVER
Storm damage repair to Trion warehouse building

 
PROJECT ELEVEN
HENDY GROUP, CHELTENHAM
Flat roof treatment using Aquapol Plus, and replacement of 70 sq. metres of GRP rooflights.

 
 
PROJECT TEN
HANTS & DORSET TRIMS, SOUTHAMPTON
Replacement of 100 sq. metres of GRP rooflights

 
PROJECT NINE
GENPLUS, WATERLOOVILLE
100 sq. metres of failed PVC barrel vaulted rooflights replaced with 12 linear metre long mansafe GRP in line profiled roof lights which were craned in place using a lifting beam.

 
PROJECT EIGHT
HENDY FORD PARTS DEPARTMENT, COSHAM
Provision of new White plastisol coated steel cladding and flashings to reclad entrance where existing sign had been removed.
 
PROJECT SEVEN
Case Study
FUEL MECHANICS, CHANDLERS FORD
400 Sq. Metre re-clad of head office and factory.
 
PROJECT SIX
Case Study
SOUTHAMPTON
250 sq m re-roof and over clad of Hampshire Model Centre
 
PROJECT FIVE
DISTRIBUTION FACILITY FOR SKY BROADCASTING & NTL, EASTLEIGH
Provision of 400 square metres of Rockwool insulation and white PVF2 under purlin lining panels.
 
PROJECT FOUR
     
 
Case Study
WINCHESTER
 
Over roof and reclad of machinery workshop and store
 
 
PROJECT THREE
OMNICO PLASTICS CHRISTCHURCH
Rooflight replacement including the provision of temporary internal safety netting.
 
PROJECT TWO
DISTRIBUTION WAREHOUSE, SOUTHAMPTON
Rooflight replacement and various roof repairs including the provision of temporary internal safety netting and edge protection scaffolding.
 
PROJECT ONE
    Case Study
WILLIAM SAWYER DAIHATSU GARAGE, ANDOVER.
Recladding of car showroom elevations and forecourt canopy.
More projects.....
© waterrail roofing services ltd 2004
Download our nrochure here!